Case study · Record 2.1AntaresAdvanced nuclear energy

They had no reactor. Fifteen months later, it went critical.

At Idaho National Laboratory, in June 2026. We captured every step.

The Antares sizzle. Credo filmed the build three to five times a month, from Torrance to Idaho National Laboratory.

AboveThe Antares sizzle. Credo filmed the build three to five times a month, from Torrance to Idaho National Laboratory. Watch it with sound →

The engagement
RECONSTRIKESIGNALEXPEDITIONARY
How the system works →
The challengeAntares
01The start
No reactor.An ambitious plan and an empty warehouse in Torrance.
02The map
Three states.Torrance, Redstone Arsenal in Huntsville, and Idaho National Laboratory, on dates that kept moving.
03The moment
One take.Criticality happens once. There is no reshoot.
An engineer inside the reactor core, looking up
A single machine in the empty Torrance warehouse
⟷
Before · An empty warehouseAfter · Inside the core

DragMonths apart: an empty warehouse floor, then an engineer inside the core. Credo filmed all of it.

What we didScroll the reel →
Antares: Led creative strategy. Shaped the story and the plan for every film, from the first brand film to criticality.SC 01 · ANTARES
Led creative strategy.Shaped the story and the plan for every film, from the first brand film to criticality.
Antares: Told the story before the hardware. The brand film, shot in Torrance and at Redstone Arsenal in Huntsville, when there was nothing to film but people and a plan.SC 02 · ANTARES
Told the story before the hardware.The brand film, shot in Torrance and at Redstone Arsenal in Huntsville, when there was nothing to film but people and a plan.
Antares: Documented the build. Three to five shoots a month between Torrance and Idaho Falls, crews ready to move when a milestone moved.SC 03 · ANTARES
Documented the build.Three to five shoots a month between Torrance and Idaho Falls, crews ready to move when a milestone moved.
Antares: Got inside Idaho National Laboratory. Filmed at MFC-793 under national laboratory access rules, with standby crews through criticality week.SC 04 · ANTARES
Got inside Idaho National Laboratory.Filmed at MFC-793 under national laboratory access rules, with standby crews through criticality week.
The result

By the numbers.

0
Months, first film to criticality
0
States, one story
TorranceHuntsvilleIdaho Falls
0
Films, plus shorts and stills
“
What this means for you

We can run the story of a breakthrough from first pitch to first criticality, wherever the work takes us.

What happened nextContext, not Credo results · Public reporting
Mark-0 · Idaho National Laboratory
CRITICAL.

The first privately developed non light water reactor to go critical in the U.S. in more than four decades.

Neutron population · illustrative
$0MSeries B · December 2025
$0MSeries C · July 2026